Background of Technical Cooperation


Client: Transformation of an AI computing power service provider | Equipment: 1,000 Dong'ao Xiong water-cooled B2 (140TH/s)


Technical Requirement: Solve the heat dissipation bottleneck of high-density mining machines and achieve overclocking efficiency.


Liquid Cooling Technical SolutionCooling System

Single-phase immersion liquid cooling (Coolant: Engineered Fluid EF-100)

 - Cabinet power density: 100kW/cabinet (traditional air cooling limit is 35kW) 

 - PUE value: 1.03 (compared with 1.25 for air cooling) 


 Energy Recycling: 

 - Waste heat recovery: Supply greenhouse planting in the park (annual heating cost savings of $280K) 

 - Grid frequency regulation: Respond to regional power grid load instructions and obtain $0.012/kWh compensation


Computing Power Optimization:


- Chip constant temperature at 45℃: Overclocked to 245TH/s (6.5% higher than the nominal value)  

- Failure rate:<0.8%>


Cooling MethodSingle Machine Hash RateEnergy Efficiency RatioAnnual Maintenance Cost
Traditional Air Cooling230TH/s22J/TH$142/unit
Liquid Cooling Hosting245TH/s20J/TH$89/unit