Background of Technical Cooperation

 

Client: Transformation of an AI computing power service provider | Equipment: 1,000 Dong'ao Xiong water-cooled B2 (140TH/s)

 

Technical Requirement: Solve the heat dissipation bottleneck of high-density mining machines and achieve overclocking efficiency.

 

Liquid Cooling Technical SolutionCooling System

Single-phase immersion liquid cooling (Coolant: Engineered Fluid EF-100)

 - Cabinet power density: 100kW/cabinet (traditional air cooling limit is 35kW) 

 - PUE value: 1.03 (compared with 1.25 for air cooling) 

 

 Energy Recycling: 

 - Waste heat recovery: Supply greenhouse planting in the park (annual heating cost savings of $280K) 

 - Grid frequency regulation: Respond to regional power grid load instructions and obtain $0.012/kWh compensation

 

Computing Power Optimization:

 

- Chip constant temperature at 45℃: Overclocked to 245TH/s (6.5% higher than the nominal value)  

- Failure rate:<0.8%>

 

Cooling Method Single Machine Hash Rate Energy Efficiency Ratio Annual Maintenance Cost
Traditional Air Cooling 230TH/s 22J/TH $142/unit
Liquid Cooling Hosting 245TH/s 20J/TH $89/unit